The Tasks define the particular work steps of a construction and phase respectively.
Some tasks are associated with a corresponding calculation task for the static analysis.
By activating the calculation option Autogenerate calculation tasks a group of calculation tasks is automatically performed (in the background) for certain tasks.
Optionally, certain calculation tasks can also be defined directly.
All generated calculation tasks can be viewed in the Logging window for checking and in the Output of the Construction, respectively.
Below you can find an overview of all available tasks with their corresponding calculation tasks and (optionally automatically generated) group of calculation task.
Task |
Description |
Calculation task |
Autom. gen. calc. task |
Meaning |
Description |
Parameters from construction |
Add. Input |
POUR |
Pour concrete |
- |
- |
- |
- |
Start Day + Duration |
- |
HARDEN |
Concrete curing |
Install concrete |
Activate members / elements |
Start Day + Duration |
(Dshrink) |
||
CONCRETE= POUR + HARDEN |
Concrete Pour + Curing |
|
Install concrete Load case self-weight Load case creep |
Activate members / elements Calculate self-weight Calculate creep & shrinkage |
Start Day + Duration |
(Dshrink) |
|
CONCCOMP |
Concrete composite part (2) |
- |
INSTCONC
INSTBEAM |
Wet concrete load
Load case creep Install concrete
Install beam Load case creep |
Wet concrete as load on girder (comp. part 2 on comp. part 1) on Start Day Calculate creep & shrinkage Activate composite part 2 (at the time Start Day + Duration) Activate composite (part 3) Calculate creep & shrinkage |
Start Day + Duration |
(Dshrink) |
INSTDUCT |
Install ducts |
- |
- |
- |
- |
- |
- |
INSTTEND |
Install tendons |
- |
- |
- |
- |
- |
- |
TSTRESS |
Stress tendons |
Tendon stress |
Evaluate tendon stressing |
- |
sgroup |
||
TGROUT |
Grout ducts |
Tendon grout |
Establish bond betw. tendons and CS |
- |
- |
||
TENSION= INSTDUCT + INSTTEND + TSTRESS + TGROUT |
Apply prestressing Install ducts Install tendons Stress tendons Grout tendons |
Tendon stress Load case stress Tendon grout |
Evaluate tendon stressing Calculate prestressing (load case) Establish bond betw. tendons and CS |
- |
sgroup |
||
SUPPORTAT |
Activate temp. supports for precast girder |
INSTSUPP |
INSTSUPP |
Install supports |
Activate spring elements |
- |
refpt at Spring constants |
REMOVALAT |
Dectivate temp. supports for precast girder |
Deactivate Load case transfer |
Deactivate elements Calculate redistribution |
|
refpt at (lcsuffix) (init) |
||
PRECASTG |
Cast concrete and apply stressing (precast girder) |
PRECASTG |
INSTCONC TSTRESS TGROUT LCSTRESS LCSELW
|
Install concrete Tendon stress Tendon grout Load case stress Load case self-weight |
Activate members / elements Evaluate tendon stressing Establish bond betw. tendons and CS Calculate prestressing (load case) Calculate self-weight
|
Start Day + Duration |
Various, see PRECAST
|
INSTCONC |
Install concrete girders |
INSTCONC |
INSTCONC |
Install concrete |
Activate members / elements |
Start Day + Duration |
(Dshrink) |
INSTCONC |
Install fictitious concrete girders |
INSTCONC |
INSTCONC |
Install concrete |
Activate members / elements |
Start Day + Duration |
(Dshrink) |
INSTBEAM |
Install steel girders |
INSTBEAM |
INSTBEAM |
Install beam Load case self-weight |
Activate members / elements Calculate self-weight |
- |
- |
INSTSUPP |
Activate bearings/springs |
INSTSUPP |
INSTSUPP |
Install supports |
Activate spring elements |
- |
- |
REMOVAL = DEACTIVATE + LCTRANSFER |
Remove elements deactivate Calculate redistribution |
Deactivate Load case transfer |
Deactivate elements Calculate redistribution |
- |
(lcsuffix) (init) |
||
CANTILEVER |
Balanced cantilever construction - task group |
Creates a series of calculation tasks that reflect the processes of the balanced cantilever construction - for details see CANTILEVER |
|||||
CONTAINER |
Task group |
|
|
|
|
|
|
CUSTOM |
User-defined task |
|
|
|
|
|
|
LABEL |
Set a marking |
|
|
|
|
|
|
Remark: The calculation task INSTCONC is not available via the user interface, since it is called up by HARDEN and CONCRETE, respectively, or directly addressed by the task INSTCONC.
To generate a new task
The task is added to the table in the View window with its name and its description and you can edit its parameters there or in the Property window.
In parallel the defined tasks are shown in the Gantt chart in the View window and you can also edit them there.
|