TGROUT

Inhalt

Index

Grout the ducts of the tendons assigned to this calculation task by assemblies

This calculation task establishes the bond between the tendons and their surrounding concrete section. Thus, they are connected with the structure and any displacement of the structure causes a respective strain in the tendon.

Arguments

none



Allplan

(C) ALLPLAN GmbH

Privacy policy