In the tab Constructions you can define constructions with their different phases and their particular tasks.

Create new constructions and phases by using the context menu (right mouse button). In the Properties window of the phase, you can also select different Construction methods for cast in situ concrete and precast girders, which is respectively considered within the design code checks.

Further, it is possible to create a phase as a template for the fabrication of precast girders (see Precast Template.

Use the task area Construction/Tasks for the defining the tasks.

The window Constructions is subdivided into two categories (accordion menus) for the Input and Output.

In the menu Output, after the calculation, all particular performed calculation tasks are output sequentially in a list in the the View window. Each of them contains the name of the calculation task, its description, its status (OK, warning, error), its start and end day, the number of the error/warnings in this calculation task, and its defined arguments. If assemblies are assigned to a calculation task, they are displayed in the 3D model in the window at the bottom of the screen when clicking on the respective line.

Note: As described in Tasks, a task has usually assigned several calculation tasks (see links for details), which are the ones that appear in the list. In the course of the calculation, sometimes additional calculation tasks are performed (such as LCOPEN, LCLCOSE, etc.) which cannot be inputted via the user interface, which are also informatively displayed in the output of the list. Another part of the output are the load case types of the calculated load cases as described in LOADCASE.