Design Checks

Inhalt

Index

Perform design checks and generate respective reports as MS-Word-files

To generate a new task for a design check

General information regarding checks:

Within the inputs denoted as env for the envelopes you can also directly refer to combinations and combination groups (see Combinations). In doing so, it is not required to create those in advance using the calculation tasks COMBROW and COMBGROUP, respectively, which in this case is done automatically. Thereby, the same rules and principles apply as described within these tasks, especially regarding the input of day.

Moreover, the input day within the design tasks defines the time/day in the construction phases, which should be taken for the check (i.e. state of the structure/cross section, tendons, concrete age). If this input is empty (or zero), then the time (start day) in the construction phases is taken, at which this design task is performed.

In this chapter

Edit design checks parameters

Notes for DIN EN

EN - Eurocode

AASHTO - LRFD

LINSTRESS: Linear stress

LINSTRESSREPORT: Report - Linear stress

CODEDATAREPORT

DCESUMMARY



Allplan

(C) ALLPLAN GmbH

Privacy policy