Reinforcement schedule
Module(s): Steel Construction Templates
You can use the
Reinforcement Schedule tool to analyze the data of steel constructions using specially designed for the Steel Construction Templates module. These reports can be sent to the printer and imported as PDF files to the document.
To create a report
- Click
Reinforcement Schedule (How). - The Reports dialog box opens. Select the folder and report and then click Open.
Tip: Clicking Default on the left takes you to the module-specific reports.
- the elements you want to include.
- Click
Find Elements in the input options to find marks based on advanced criteria. - Select the elements by clicking them, enclosing them in a selection rectangle or using the bracket tool
Or:
Double-click with the right mouse button or click All in the Input options to select all the elements.
- The report is displayed in the Report Viewer and you can edit it as follows:
- You can customize the report,
- Print it,
- Place it in the current document,
- Save it as a file in Excel, PDF or Word format, or
- Edit it using the
Layout Designer.
You can save changes as a new template in RDLC format.
- Print or save the report.
Tip: Placing report in the current document