Configuration(s) Half floor: entry + Hollow core element: entry + Prestressed hollow core element: entry + Concrete slab: entry + TT slab: entry + BubbleDeck: entry + Cobiax slab: entry + Brick slab: entry + Concrete brick slab: entry
Configuration(s) Double wall: entry + Concrete wall: entry + Brick wall: entry + Wall panel: entry + Double wall (new): entry + Concrete wall (new): entry + Thermal wall: entry + Sandwich wall: entry
Configuration(s): Structural precast elements: general entry
The following definitions are required if the status is to change automatically with specific Allplan tools. So that you can use the automatism, it is essential that you define a status for valid and invalid elements.
'Valid precast element' tab
States for a valid precast element:
Definition of precast element states. A valid precast element has to fulfill these conditions. Depending on the element type, different states can be selected:
The conditions a valid precast element has to fulfill are predefined for the configuration of walls that are created with the Wall Element Design tool.
Element status for
Valid / Invalid precast element:
Status the program assigns to the element when designing or modifying after having checked the states defined. The list box includes all the entries that are defined in the status admin catalog and assigned to the current factory.
'Rearrange/element plan/stack' tab
"Rearrange marks" / "Print element plan" / "Stacking" action
valid for elements with status / New element status:
Define the automatism for raising the status. Select the minimum status (= Valid for element with status) the element has to reach before it can be raised to the new, next higher status (= New element status) and the new element status. The list box includes all the entries that are defined in the status admin catalog and assigned to the current factory.
If you want to ignore a specific action, just leave the two boxes empty (= ---).
Notes:
'Production planning' tab
"Transfer data to production planning" action
valid for elements with status / New element status:
See 'Rearrange/element plan/stack' tab. You can use the Production Data Transfer and
Production Data/NC Generator tools to set the action and the associated status.
Status in case of problems during generation of production data
Missing link to invoicing item:
Production dimensions not confirmed:
Transport dimensions not confirmed:
These settings have no effect at the moment.