Description
The concrete is poured and hardens. After that, the affected structural parts are activated and the composite is established.
Arguments
The basic arguments correspond to those of all tasks (cf. TCL Command TASK). The other arguments are to be entered in the form "key=value".
There are following other specific predefined arguments:
Key |
Value |
Dimension |
Meaning |
Dshrink |
dshday |
INT |
Start of drying shrinkage |
Scopes
TASKS, CONTAINER
Examples
ASSEMBLIES BEGIN
ASM 1 MEMBER "Plate" BEAM 2 SGLOBAL * SGLOBAL *
ASSEMBLIES END
TASKS BEGIN
TASK CONCRETECOMP 71 LOCAL 21 1 "Dshrink=0"
TASKS END
The concreting of the structural members of assembly 1 starts at day 71 and takes 21 days. The start of drying shrinkage is immediate. The structural unit 2 of the plate is the single element as part of the composite. When the individual part is activated, the composite becomes active.
|