Pier

Inhalt

Index

Depending on the type of definition of the pier to be copied which is automatically detected by the program, there are different respective input procedures. Moreover, when copying a pier, certain parameters can be modified, depending on the type of definition.

To copy a pier

  1. Click Copy/Pier.
  2. Click the pier in the view window of the 3D model which you want to copy.
  3. Optionally, edit the name and the description of the pier in the opening window.
  4. Choose via the selection box Variation in the same window, if the existing variations of the pier to be copied should be taken over for the copied pier.
  5. Confirm the input with OK.
  6. Depending on the type of definition of the pier to be copied, analogously proceed as described in Move starting from step 3:

    Pier at reference point

    Pier at station point

    Pier relative to axis

    Pier relative to two axes

    Pier relative to axis and reference point