Pier
Depending on the type of definition of the pier to be copied which is automatically detected by the program, there are different respective input procedures. Moreover, when copying a pier, certain parameters can be modified, depending on the type of definition.
To copy a pier
- Click Copy/Pier.
- Click the pier in the view window of the 3D model which you want to copy.
- Optionally, edit the name and the description of the pier in the opening window.
- Choose via the selection box Variation in the same window, if the existing variations of the pier to be copied should be taken over for the copied pier.
- Confirm the input with OK.
- Depending on the type of definition of the pier to be copied, analogously proceed as described in Move starting from step 3:
Pier at reference point
Pier at station point
Pier relative to axis
Pier relative to two axes
Pier relative to axis and reference point