Architects often need to create a demolition drawing even before the building alteration drawing is complete. A demolition drawing (required by the demolition contractor) shows the objects that are to be demolished. In other words, this drawing only contains the objects that are retained (as-built data) and demolished (demolition data). New building objects are not included.
Allplan provides a specific print set.
Note: If you are working with the Allplan 2016 IBD Building Alteration package, use the corresponding IBD display favorites.
(C) Allplan GmbH | Privacy policy |