TCL Script - Access to the analysis model

Inhalt

Index

Access to the analysis model has been significantly expanded with version 2025-0. Elements, nodes, cross-sections and materials can be retrieved. The list of analysis schedules can also be accessed. The analysis schedules are required in order to be able to read the various results.

In this chapter

TCL Command ABASCHEDULES

TCL Command ABASCHEDULE

TCL Command ABAELEMS

TCL Command ABAELEM

TCL Command ABANODES

TCL Command ABANODE

TCL Command ABASECTIONS

TCL Command ABASECTION

TCL Command ABAMATERIALS

TCL Command ABAMATERIAL



Allplan

(C) ALLPLAN GmbH

Privacy policy