LCCOPY

Inhalt

Index

Copy a load case lc to a load case lcdst.

Arguments

lc (load case)

Name of the load case to be copied

lcdst (load case destination)

Name of the load case to be copied to

day

Time/day in the construction phases for determining the load case lc, which should be taken

The load case for this day must exist to be able to perform this calculation action.



Allplan

(C) ALLPLAN GmbH

Privacy policy