Copy a load case lc to a load case lcdst.
Arguments
lc (load case)
Name of the load case to be copied
lcdst (load case destination)
Name of the load case to be copied to
day
Time/day in the construction phases for determining the load case lc, which should be taken
The load case for this day must exist to be able to perform this calculation action.
|
(C) ALLPLAN GmbH |
Privacy policy |