General

The tools of the DT Reinforcement task area have been developed to support the workflow for defining multiple double-tee beams in a standardized way. It is possible to define lowering points to ensure proper drainage, resulting in warped elements.

The warped elements represent the final state of the double-tee beams on site and are therefore intended for the preparation of erection drawings. In a second step, the warped elements need to be unwarped and reinforced to represent the production state of the double-tee beams. By converting all unwarped elements to precast elements, you can easily derive shop drawings in batch mode (license for precast elements required).