Configuration Half Floor: Design + Hollow Core Element: Design + Prestressed hollow core element: Design + Concrete Slab: Design + Brick slab: Design + Concrete Brick Slab: Design
Configuration Double Wall: Design + Concrete Wall: Design + Double wall (iWall): Design + Concrete Wall (iWall): Design + Thermal Wall (iWall) Design + Sandwich wall (iWall) Design + Brick wall (iWall): Design
Configurations: Structural Precast Elements Element creation
The following definitions are required if the status is to change automatically with specific Allplan tools. So that you can use the automatism, you must define a status for valid and invalid elements.
"Valid precast element" tab
States for a valid precast element:
Definition of precast element states. A valid precast element must fulfill these conditions. Depending on the element type, different states can be selected:
The conditions a valid precast element must fulfill are predefined for the configuration of walls that are created with the Design (iWall) tool.
Element status for
valid / invalid precast element:
Status the program assigns to the element when designing or modifying after having checked the states defined. The list box provides all entries that are defined in the status admin catalog and assigned to the current factory.
"Rearrange/element plan/stack" tab
"Rearrange marks" action / "Print element plan" / "Stacking"
Valid for elements with status / New element status:
Define the automatism for raising the status. Select the minimum status (= Valid for element with status) the element must reach before it can be raised to the new, next higher status (= New element status) and the new element status. The list box provides all entries that are defined in the status admin catalog and assigned to the current factory.
If you want to ignore a specific action, just leave the two boxes empty (= ---).
Notes:
"Production planning" tab
"Transfer data to production planning" action
Valid for elements with status / New element status:
See "Rearrange/element plan/stack" tab as described above. You can use the Production Data, NC Generator tool to define the action and the associated status.
Status of problems during creation of production data
Missing link to invoicing item:
This setting has no effect at the moment.
(C) ALLPLAN GmbH |
Privacy policy |